No. 99-881
In the Supreme Court of the United States
LLOYD A. GOOD, JR., PETITIONER
v.
UNITED STATES OF AMERICA
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE FEDERAL CIRCUIT
BRIEF FOR THE UNITED STATES IN OPPOSITION
SETH P. WAXMAN
Solicitor General
Counsel of Record
LOIS J. SCHIFFER
Assistant Attorney General
WILLIAM B. LAZARUS
ETHAN G. SHENKMAN
Attorneys
Department of Justice
Washington, D.C. 20530-0001
(202) 514-2217
QUESTIONS PRESENTED
1. Whether a property owner's failure to demonstrate interference with his
reasonable, investment-backed expectations may be dispositive of his regulatory
takings claim, without regard to the economic impact of the challenged government
regulation.
2. Whether the court of appeals correctly held that the denial of petitioner's
application for a dredge-and-fill permit under the Rivers and Harbors Appropriation
Act of 1899 and the Federal Water Pollution Control Act did not effect a
taking of petitioner's property.
In the Supreme Court of the United States
No. 99-881
LLOYD A. GOOD, JR., PETITIONER
v.
UNITED STATES OF AMERICA
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE FEDERAL CIRCUIT
BRIEF FOR THE UNITED STATES IN OPPOSITION
OPINIONS BELOW
The opinion of the court of appeals (Pet. App. 1a-15a) is reported at 189
F.3d 1355. The opinion of the Court of Federal Claims (Pet. App. 16a-87a)
is reported at 39 Fed. Cl. 81.
JURISDICTION
The judgment of the court of appeals was entered on August 31, 1999. The
petition for a writ of certiorari was filed on November 24, 1999. The jurisdiction
of this Court is invoked under 28 U.S.C. 1254(1).
STATEMENT
1. This case involves a 40-acre parcel of land abutting Sugarloaf Sound
(a navigable waterway) in Lower Sugarloaf Key, Monroe County, Florida. The
parcel consists of two wetlands areas-26 acres of salt marsh fringed with
mangroves, and six acres of freshwater sawgrass marsh-separated by an uplands
area of roughly eight acres. Pet. App. 19a. The parcel was part of a $2
million portfolio of properties located throughout Lower Sugarloaf Key and
Saddlebunch Key. Id. at 20a & n.2. Petitioner acquired a 70 percent
interest in the parcel (as part of the portfolio) in 1973, and he acquired
the remainder of the parcel two years later upon the death of his mother.
Ibid. The total cost of the parcel in 1973 was $66,576.68. C.A. App. 389.1
When petitioner and his mother purchased the parcel in October 1973, each
of the federal permit requirements relevant to this case was already in
effect. Indeed, in the purchase contract for the parcel, petitioner expressly
acknowledged the risk that "as of today there are certain problems
in connection with the obtaining of State and Federal permission for dredging
and filling operations." Pet. App. 2a. Section 10 of the Rivers and
Harbors Appropriation Act of 1899 (RHA) prohibited construction activities
below the mean high water mark (MHWM) of navigable waters without a permit
from the Army Corps of Engineers (Corps). See 33 U.S.C. 403. A permit was
also required under RHA Section 10 for construction activities occurring
above the MHWM for purposes of creating a connection to and/or expanding
the scope of the navigable waters (e.g., in this case, the dredging of a
canal or marina connecting to Sugarloaf Sound).2 Since 1968, applications
for RHA Section 10 permits had been subject to the Corps' "public interest
review" regulations, which required the Corps to scrutinize a project's
effects on water quality, recreation, fish and wildlife, pollution, and
natural resources, in addition to effects on navigation. See 33 C.F.R. 209.120(d)(1)
(1973); 33 C.F.R. 320.4(a); United States v. Alaska, 503 U.S. 569, 580-581
(1992) (describing the development of the Corps' approach, and stating that
"the language of the statute and [the Court's] decisions interpreting
it plainly authorized" the Corps' consideration of the factors set
forth in the regulation); Deltona Corp. v. United States, 657 F.2d 1184,
1187 (Ct. Cl. 1981), cert. denied, 455 U.S. 1017 (1982).3
In 1972, Congress enacted Section 404 of the Federal Water Pollution Control
Act (Clean Water Act or CWA), 33 U.S.C. 1344.4 Section 404 expanded the
geographic scope of the Corps' regulatory jurisdiction by requiring a permit
for discharges of dredge or fill material into any "navigable waters,"
33 U.S.C. 1344(a), defined for purposes of the CWA as "the waters of
the United States," 33 U.S.C. 1362(7). The Corps' jurisdiction under
Section 404 is not limited by traditional conceptions of navigability but
includes, inter alia, wetlands above the MHWM that are adjacent to navigable
waters. See United States v. Riverside Bayview Homes, Inc., 474 U.S. 121,
131-135 (1985).5 Applications for Section 404 permits are subject to review
both under the Corps' public interest review regulations and under specific
environmental guidelines promulgated by the United States Environmental
Protection Agency (EPA) and the Corps pursuant to Section 404(b)(1) of the
CWA, 33 U.S.C. 1344(b)(1). See 40 C.F.R. Pt. 230; see also 33 U.S.C. 1344(c)
(authorizing EPA to veto the Corps' issuance of a Section 404 permit based
on, inter alia, adverse impacts on wildlife).6
2. Petitioner's efforts to develop the parcel at issue here began in 1980,
when he entered into a contingency-fee arrangement with a consulting firm
to obtain the necessary local, state, and federal permits. Pet. App. 21a.
The agreement provided that petitioner would pay a fixed fee of $24,000,
plus one-third of any increase above $350,000 in the value of the parcel.
Ibid. The agreement noted that "obtaining such permits is at best difficult
and by no means assured." Ibid.
Petitioner first applied for a federal RHA/CWA dredge-and-fill permit in
1981. Pet. App. 22a.7 His application (as amended) was based on a plan to
build a 54-lot subdivision of single-family homes, complete with a 48-slip
marina providing navigable access to Upper Sugarloaf Sound. Ibid. The development
would have eliminated approximately 12.8 acres of wetlands. Id. at 22a-24a.
The Corps granted that permit in 1983. Id. at 22a.8 Petitioner was ultimately
unable, however, to secure all of the necessary state and local regulatory
approvals. Id. at 24a-30a.
3. In 1990, petitioner applied to the Corps for a new RHA/CWA permit based
on a revised plan. Pet. App. 30a.9 The revised plan involved construction
of 16 single-family homesites (all in wetlands, on completely filled lots),
a navigable canal connecting to Upper Sugarloaf Sound, and a tennis court.
Id. at 5a-6a, 30a- 31a. Although the 1990 plan reduced the density of residential
development as compared to the previous 54-lot plan, the plan would have
only slightly reduced the overall loss of wetlands, from 10.53 acres to
10.17 acres. Id. at 30a.
Shortly before petitioner submitted the 1990 application, the Lower Keys
marsh rabbit was listed as endangered under the Endangered Species Act of
1973 (ESA), 16 U.S.C. 1531 et seq. See 55 Fed. Reg. 25,588 (1990). In April
1991, the silver rice rat was also listed as endangered. See 56 Fed. Reg.
19,809 (1991). Pursuant to Section 7(a)(2) of the ESA, 16 U.S.C. 1536(a)(2),
the Corps and the United States Fish and Wildlife Service (FWS) therefore
initiated formal "consultation" on the project.10 The FWS issued
a Biological Opinion in December 1991, concluding that petitioner's proposed
development was likely to jeopardize the continued existence of both species.
Pet. App. 36a. As required by the ESA (see note 10, supra), the FWS proposed
a series of "reasonable and prudent alternatives" to petitioner's
plan, which would have allowed development of the parcel in a manner protective
of the species. Id. at 36a-37a.
Although petitioner was afforded an opportunity to participate in the process
by which the reasonable and prudent alternatives were developed, he declined
to do so. Pet. App. 37a-38a & n.24. Instead petitioner submitted a letter
from his environmental consultant and mammalogist, Dr. Larry Brown. Id.
at 38a. Dr. Brown expressed the view that the marsh rabbit and silver rice
rat were not found on the parcel in question, and that petitioner's proposed
development therefore would not jeopardize the continued existence of the
listed species. Ibid.
In March 1994, the Corps denied petitioner's permit application on the ground
that the development proposed by petitioner would jeopardize the continued
existence of the marsh rabbit. C.A. App. 338, 347. The Corps endorsed the
reasonable and prudent alternatives suggested by the FWS, explaining that
they were consistent with the project's purpose and would prevent jeopardy
to the listed species. Pet. App. 39a. In response, petitioner asserted for
the first time (based on a new report from Dr. Brown) that any development
on the parcel would violate the ESA. Id. at 39a-40a. Shortly thereafter,
petitioner filed suit against the United States in the Court of Federal
Claims (CFC), alleging that the Corps' denial of his permit application
had effected a taking of his property. Id. at 40a.11
4. The CFC granted summary judgment for the United States. Pet. App. 16a-87a.
The court held that petitioner could not establish a "total" taking
under Lucas v. South Carolina Coastal Council, 505 U.S. 1003 (1992), because
the Corps' actions did not render the parcel valueless or deprive petitioner
of all economically viable use of his land. Pet. App. 51a-74a. The CFC relied
on uncontested evidence presented by the government's appraiser, who had
determined that (1) the property would have a fair market value of $80,000
if development were permitted in accordance with the revised reasonable
and prudent alternatives12 (id. at 68a-71a), and (2) the highest and best
use of the property was for the sale of transferrable development rights
(TDRs), which were worth approximately $110,000 (id. at 72a-74a).
The CFC also held that petitioner could not establish a taking under the
three-part test set forth in Penn Central Transportation Co. v. New York
City, 438 U.S. 104, 124 (1978). Pet. App. 74a-86a. The CFC ruled that the
Corps' actions could not have interfered with petitioner's reasonable, investment-backed
expectations, given the pervasiveness of the state and federal regulatory
regimes in place at the time of petitioner's investment, and the fact that
petitioner had knowingly assumed the risk that it might be difficult to
obtain approvals for his project. Id. at 78a-84a. The court noted in particular
that the sorts of dredge-and-fill operations contemplated by petitioner's
development proposal
had * * * been subject to federal regulation since the 1899 enactment of
the RHA and its prohibition on such activities except by permit. By the
late 1960s, the Corps RHA permit review included the consideration not only
of navigation, but also of fish and wildlife, conservation, pollution, aesthetics,
ecology and the general public interest.
Id. at 78a (citation omitted).
5. The court of appeals affirmed. Pet. App. 1a-15a. The court rejected petitioner's
argument that his reasonable, investment-backed expectations were irrelevant
to his "total" taking claim. Id. at 9a-11a. It held that "[r]easonable,
investment-backed expectations are an element of every regulatory takings
case." Id. at 10a. Because the court of appeals found "the expectations
factor dispositive" in the instant case, it declined to address "the
character of the government action or the economic impact of the regulation."
Id. at 9a.
Petitioner emphasized that the Corps had approved his prior RHA/CWA permit
applications and had denied the 1990 application solely on the ground that
the proposed development would jeopardize the continued existence of a newly
listed endangered species. See Pet. App. 11a-12a. Because the enactment
of the ESA and the listing of the species postdated his acquisition of the
property, petitioner contended that denial of the permit on ESA grounds
necessarily interfered with his reasonable, investment-backed expectations.
See id. at 12a. The court of appeals rejected that contention. It observed
that
[i]n 1973, when [petitioner] purchased the subject land, federal law required
that a permit be obtained from the Army Corps of Engineers in order to dredge
or fill in water adjacent to a navigable waterway. Even in 1973, the Corps
had been considering environmental criteria in its permitting decisions
for a number of years.
Ibid.
The court of appeals noted as well that development of the subject parcel
required approval by state and county officials, and that petitioner had
"acknowledged both the necessity and the difficulty of obtaining regulatory
approval" at the time he acquired the property. Pet. App. 13a. The
court also explained that environmental regulation had grown more pervasive
during the period between 1973 (when petitioner and his mother bought the
parcel) and 1980 (when petitioner undertook his initial efforts to develop
the property). Id. at 13a-14a. In light of all those factors, the court
of appeals concluded that petitioner "lacked the reasonable, investment-backed
expectations that are necessary to establish that a government action effects
a regulatory taking." Id. at 15a.
ARGUMENT
The court of appeals' decision is correct and does not conflict with the
decisions of this Court, any other court of appeals, or any state court
of last resort. Further review is not warranted.
1. The requirement of a Corps permit for dredge-and-fill operations of the
sort at issue here was established long before petitioner and his mother
purchased the subject property in 1973. See Pet. App. 12a, 78a; pp. 2-3,
supra. The Corps' authority under Section 10 of the RHA is broad indeed.
"The statute itself contains no criteria by which the Secretary is
to make an authorization decision; on its face, the provision appears to
give the Secretary unlimited discretion to grant or deny a permit."
United States v. Alaska, 503 U.S. 569, 576 (1992).
The breadth of discretion vested in the Corps by Section 10 reflects the
paramount federal interest in activities affecting navigable waters. With
respect to navigable waters, the federal government possesses
a "dominant servitude," FPC v. Niagara Mohawk Power Corp., 347
U.S. 239, 249 (1954), which extends to the entire stream and the stream
bed below ordinary high-water mark. The proper exercise of this power is
not an invasion of any private property rights in the stream or the lands
underlying it, for the damage sustained does not result from taking property
from riparian owners within the meaning of the Fifth Amendment but from
the lawful exercise of a power to which the interests of riparian owners
have always been subject.
United States v. Rands, 389 U.S. 121, 123 (1967); see United States v. Cherokee
Nation, 480 U.S. 700, 703-705 (1987). Although "this Court has never
held that the navigational servitude creates a blanket exception to the
Takings Clause," Kaiser Aetna v. United States, 444 U.S. 164, 172 (1979),13
petitioner was on notice in 1973 that his ability to undertake development
affecting navigable waters would be subject to extensive federal oversight.14
It was also clear, at the time of purchase, that the Corps' decision whether
to grant or deny a development permit would be based in part on environmental
factors, including wildlife conservation. See Pet. App. 12a, 78a; p. 3 &
note 3, supra. The enactment of the ESA in December 1973 changed the governing
legal regime to a degree by forbidding the Corps to approve a development
project that was likely to jeopardize the continued existence of an endangered
species. Even before the ESA was enacted, however, the Corps possessed discretion
to deny a permit application on that ground. Petitioner therefore could
not have possessed a reasonable expectation that he would be permitted to
develop his waterfront parcel in a manner inconsistent with wildlife conservation
values generally, or with the protection of especially vulnerable species
in particular. Indeed, the Fifth Circuit-which at that time included the
State of Florida-had held in 1970 that the Corps was required to consult
with the FWS and state conservation agencies regarding wildlife conservation
issues before issuing a Section 10 permit. See Zabel v. Tabb, supra, discussed
at note 3, supra, and in United States v. Alaska, 503 U.S. at 581.
At bottom, the fundamental inquiry in every takings case is "whether
justice and fairness require that economic injuries caused by public action
must be compensated by the government, rather than remain disproportionately
concentrated on a few persons." Eastern Enter. v. Apfel, 524 U.S. 498,
523 (1998) (opinion of O'Connor, J.) (brackets and internal quotation marks
omitted). In the instant case, petitioner chose to purchase land subject
to a "dominant servitude" of the federal government. Petitioner
was on notice at the time of purchase that any development affecting navigable
waters would implicate important federal interests and would therefore require
express federal approval. He was on notice as well that the Corps was vested
by the RHA with very broad discretion to determine whether particular development
proposals should be allowed, and that the permitting process would include
consideration of wildlife conservation and other environmental values.
The existence of those potential barriers to development (as well as parallel
state and local permitting requirements) was presumably factored into the
purchase price. As the court of appeals recognized, "[o]ne who buys
with knowledge of a restraint assumes the risk of economic loss. In such
a case, the owner presumably paid a discounted price for the property. Compensating
him for a 'taking' would confer a windfall." Pet. App. 11a (quoting
Creppel v. United States, 41 F.3d 627, 632 (Fed. Cir. 1994)).15 Of course,
if petitioner had succeeded in obtaining all of the requisite government
approvals for his most ambitious development proposal, he would have reaped
an enormous profit. But given the speculative nature of his original investment,
petitioner cannot reasonably contend that the costs of wildlife protection
have been "disproportionately concentrated" (Eastern Enters.,
524 U.S. at 523 (opinion of O'Connor, J.)) upon him. To the contrary, petitioner
chose to purchase land for which the prospects of development were uncertain
and the degree of federal regulatory oversight high.16
2. Petitioner contends that the court of appeals' decision conflicts with
this Court's decision in Lucas v. South Carolina Coastal Council, 505 U.S.
1003 (1992). That argument is incorrect.
Lucas did not hold that a property owner's reasonable, investment-backed
expectations are irrelevant whenever a "total" taking is alleged.
As Lucas explained, this Court has "generally eschewed any set formula"
in deciding "when, and under what circumstances, a given regulation
* * * [goes] too far for purposes of the Fifth Amendment," preferring
instead to "engag[e] in . . . essentially ad hoc, factual inquiries."
Lucas, 505 U.S. at 1015 (internal quotation marks omitted). Three factors
are of "particular significance" to that ad hoc inquiry: "the
economic impact of the regulation, its interference with reasonable investment
backed expectations, and the character of the government action." Keystone
Bituminous Coal Ass'n v. DeBenedictis, 480 U.S. 470, 495 (1987).
In Lucas, this Court noted that there are "at least two discrete categories
of regulatory action [that are] compensable without case-specific inquiry
into the public interest advanced in support of the restraint": regulations
that compel the property owner to suffer a physical "invasion"
of his property, and regulations that deny "all economically beneficial
or productive use of land." 505 U.S. at 1015. Although the Court held
that such cases may receive "categorical treatment," in the sense
that there is no need for "case-specific inquiry into the public interest
advanced in support of the restraint," the Court did not say that a
property owner's lack of reasonable, investment-backed expectations would
be of no moment.17
The plaintiff in Lucas had acquired two beachfront lots in South Carolina
in 1986, at a time when "he was not legally obligated to obtain a permit
from the [South Carolina Coastal] Council in advance of any development
activity." 505 U.S. at 1008. He intended to erect single family residences
on his lots, as the owners of the immediately adjacent parcels had been
allowed to do. Ibid. The enactment in 1988 of the South Carolina Beachfront
Management Act, however, "brought Lucas's plans to an abrupt end."
Ibid. The Act and its implementing regulations created a new, absolute ban
on coastal-zone construction, which effectively prohibited development of
Lucas's tract. Id. at 1008-1009. Under those circumstances, the Court held
that, if the effect of the development ban was to render the parcels valueless,
the ban would effect a Fifth Amendment taking. Id. at 1020-1032.
The Court also recognized, however, that land-use regulation will not effect
a compensable taking, even if it prohibits all economically beneficial use
of the property, if the limitations it imposes "inhere in the title
itself, in the restrictions that background principles of the State's law
of property and nuisance already place upon land ownership." 505 U.S.
at 1029. The Court cited the federal government's navigational servitude
as an example of the sort of "pre-existing limitation upon the landowner's
title" the enforcement of which would not trigger takings liability.
Id. at 1028-1029. The Court also made clear that no compensable taking occurs
when the government discovers new information revealing that a particular
use of land runs afoul of a pre-existing limitation. See id. at 1028-1029
(recognizing that "the corporate owner of a nuclear generating plant"
is not entitled to compensation under the Fifth Amendment "when it
is directed to remove all improvements from its land upon discovery that
the plant sits astride an earthquake fault").
As we explain above, it was clear at the time petitioner bought the subject
parcel that dredge-and-fill activities affecting navigable waters implicated
substantial and longstanding federal interests; that the Corps of Engineers
would have very broad discretion to determine whether any such activities
would be permitted; and that its exercise of discretion would include consideration
of (inter alia) wildlife conservation factors. Those limitations on the
use of the parcel "inhere[d] in [petitioner's] title." Lucas,
505 U.S. at 1029. Nor can petitioner establish a takings claim simply through
proof that the presence of endangered species on the subject parcel was
unknown and unanticipated at the time of purchase. As with the hypothetical
nuclear generator described in Lucas, the belated discovery that particular
uses of petitioner's land fall under a pre-existing limitation does not
disappoint petitioner's reasonable, investment-backed expectations in a
manner that could give rise to takings liability.
3. The court of appeals' decision in this case does not conflict with the
holdings of any other court of appeals or state court of last resort. Most
significantly, none of the cases on which petitioner relies involves federal
regulation of activities affecting the navigable waters of the United States.
Petitioner's claim of a conflict incorrectly assumes (inter alia) that the
constitutional rules generally governing land-use regulation apply with
full force to property that is subject to the federal government's navigational
servitude. The cases cited by petitioner are distinguishable on other grounds
as well.
The Ninth Circuit cases cited by petitioner (Pet. 12-17) are inapposite.
In Dodd v. Hood River County, 136 F.3d 1219 (9th Cir.), cert. denied, 119
S. Ct. 278 (1998), for instance, the court noted (in the course of finding
no taking) that Lucas did not apply to the case before it because the zoning
decision being challenged had not deprived the claimant's property of all
value. Id. at 1228. The court's one-sentence description of the categorical
takings test under Lucas (ibid.) was dictum.
The Ninth Circuit's decision in Del Monte Dunes at Monterey, Ltd. v. City
of Monterey, 95 F.3d 1422 (1996), aff'd, 526 U.S. 687 (1999), is similarly
inapposite. There, the court held that the evidence presented at trial was
sufficient to support the jury's finding that the city had deprived the
property owner of all economically viable use of its land. Id. at 1432-1434.
The court did not address the question whether property owners who find
themselves in that situation are entitled to just compensation even where
they lacked any reasonable, investment-backed expectation that they would
be able to develop their property. Furthermore, the court characterized
a Lucas-based categorical taking as "absolute" in that "no
inquiry into the state's interests advanced in support of the regulation
is required" (id. at 1432)-a statement consistent with the decision
below.18
Petitioner cites a string of state court decisions (Pet. 14-17), but none
of them creates a conflict that would warrant this Court's review. Of the
four cases on which petitioner places primary reliance (Pet. 14-15), only
the Vermont Supreme Court's decision in Chioffi v. City of Winooski, 676
A.2d 786 (1996), was issued by a state court of last resort. The holding
of that case, however -a finding that no taking had occurred because, inter
alia, the zoning variance denial at issue did not cause a total diminution
in value (id. at 790)-poses no conflict with the decision below.
The other three state court cases that petitioner highlights are decisions
of intermediate appellate courts in which further review has been granted.19
In any event, in none of those cases did the court squarely confront the
situation where an owner, whose property has been rendered valueless by
government action, cannot demonstrate any interference with reasonable,
investment-backed expectations. Indeed, we are aware of no decision, from
a court of appeals or a state court of last resort, in which a court has
found a taking while holding that the challenged government regulation did
not interfere with the claimant's reasonable, investment-backed expectations.
4. Even if the question presented warranted this Court's review, the instant
case would be an inappropriate vehicle for resolving it. Neither the ESA
nor the Corps' denial of petitioner's 1990 permit application placed a blanket
prohibition on development of petitioner's parcel or, therefore, deprived
it of all economic use of value. To the contrary, the 1995 revised reasonable
and prudent alternatives, drafted by the FWS and endorsed by the Corps,
represent the agencies' determination that petitioner's proposal could be
modified to protect endangered species while at the same time allowing a
significant degree of development (including construction of seven or eight
out of the 16 proposed waterfront homesites). See note 11, supra. Petitioner
also remains free to suggest other means by which the parcel could be developed
in a manner that does not jeopardize listed species, but he has thus far
declined to do so. See Pet. App. 37a-40a (describing petitioner's prior
refusal to cooperate in the process by which reasonable and prudent alternatives
to his 1990 development proposal were formulated). And petitioner could
develop the uplands portion of the tract without obtaining an RHA/CWA permit
from the Corps.
Moreover, the CFC squarely held that the Corps' permit denial did not render
the subject property valueless because the property (a) would have a fair
market value of $80,000 if development were permitted in accordance with
the revised reasonable and prudent alternatives proposed by the FWS and
accepted by the Corps (and if all necessary state and local approvals could
be obtained), and (b) could also be used for the sale of transferrable development
rights worth $112,000. Indeed, the parcel at issue is currently worth more
in absolute dollar terms (though presumably somewhat less in constant dollars)
than the $66,576.68 (see note 1, supra) that petitioner and his mother paid
for it. Because the Corps' denial of petitioner's permit application did
not deprive the property of all economic value, petitioner could not establish
a compensable taking even if the court were required to ignore the question
whether he had any reasonable, investment-backed expectations at the time
of purchase.
In the court of appeals, petitioner contended that the relevant comparison
for "total taking" purposes was between the value of the parcel
under the reasonable and prudent alternatives suggested by the Corps, and
the value the land would have had if petitioner's 1990 permit application
had been granted in full (assuming in each case that petitioner could obtain
the requisite state and local approvals). See Pet. C.A. Br. 26- 32. Thus,
petitioner relied on evidence that the property would have a value of between
$1,200,000 and $1,540,000 if it could be developed in the manner described
in petitioner's 1990 permit application. Id. at 27. By comparing that hypothetical
value to the property's current value of $80,000 (for development under
the revised RPAs, assuming state and local approval) or $112,000 (for the
sale of TDRs), petitioner contended that the Corps' permit denial had effected
a "diminution" in the parcel's value of over 90%. Id. at 23, 27,
28, 32.
The practical implications of petitioner's legal theory-i.e., his contention
that a land-use restriction that precludes all economically viable use effects
a taking regardless of whether the owner had a reasonable, investment-backed
expectation that he would be able to develop the property-cannot realistically
be assessed in isolation from the issue of how a denial of economically
viable use is to be identified. As we explain above, petitioner has contended
that a "diminution" in value sufficient to establish a "total"
taking can be established by comparing the property's actual value to the
hypothetical value it would have if an existing use restriction were eliminated.
When combined with petitioner's contention that reasonable, investment-backed
expectations are irrelevant in a "total taking" case, petitioner's
theory has extraordinary implications for land-use regulation. His theory
logically implies that a person could purchase a tract of real property
that was subject to pre-existing restrictions (e.g., land that was zoned
for a particular use) and immediately establish a total taking simply through
proof that the land would dramatically appreciate in value if the restrictions
were eliminated. Nothing in this Court's decisions supports such a result.
CONCLUSION
The petition for a writ of certiorari should be denied.
Respectfully submitted.
SETH P. WAXMAN
Solicitor General
LOIS J. SCHIFFER
Assistant Attorney General
WILLIAM B. LAZARUS
ETHAN G. SHENKMAN
Attorneys
MARCH 2000
1 The petition states that petitioner and his mother purchased the land
in 1973 for approximately $93,000. Pet. 3. In fact, $92,718.78 is petitioner's
claimed "basis" in the property. Pet. App. 20a. That basis was
calculated by adding $46,603.68 (the 1973 purchase price of petitioner's
70% share) and $46,115.10 (the asserted value of the 30% share belonging
to petitioner's mother as of her death in 1975). C.A. App. 389. The 1973
purchase price of petitioner's mother's share was $19,973. Ibid. Thus, the
total 1973 purchase price of the parcel was $66,576.68 ($46,603.68 plus
$19,973).
2 See United States v. Sexton Cove Estates, Inc., 526 F.2d 1293, 1296-1299
(5th Cir. 1976); Weiszmann v. United States Army Corps of Engineers, 526
F.2d 1302, 1304 (5th Cir. 1976); United States v. Joseph G. Moretti, Inc.,
526 F.2d 1306, 1310 (5th Cir. 1976).
3 In Zabel v. Tabb, 430 F.2d 199 (5th Cir. 1970), cert. denied, 401 U.S.
910 (1971), the court of appeals upheld the Corps' authority to consider
conservation factors in making permitting decisions under Section 10 of
the RHA. The court observed that the RHA "does not put any restrictions
on denial of a permit or the reasons why the Secretary may refuse to grant
a permit to one seeking to build structures on or dredge and fill his own
property." Id. at 207. After extensive consideration of the RHA and
related statutory provisions, id. at 207-214, the court concluded that "the
Secretary can refuse on conservation grounds to grant a permit under the
Rivers and Harbors Act," id. at 214. The court observed, inter alia,
that the Corps is required under the Fish and Wildlife Coordination Act
(FWCA), 16 U.S.C. 661 et seq., to consult with the U.S. Fish and Wildlife
Service and state conservation agencies regarding wildlife conservation
issues before issuing a Section 10 permit. 430 F.2d at 209 & n.18.
4 Section 404 of the CWA was enacted as part of the 1972 amendments to the
Federal Water Pollution Control Act. See Pub. L. No. 92-500, § 2, 86
Stat. 884.
5 The Corps did not revise its CWA Section 404 regulations to require permits
for discharges of dredged or fill material into adjacent wetlands until
1975. See Riverside Bayview, 474 U.S. at 123-124. By the time of petitioner's
purchase, however, the term "navigable waters" in the CWA had
been judicially construed to reach all waters that may be regulated under
the Commerce Clause. See United States v. Ashland Oil & Transp. Co.,
364 F. Supp. 349, 351 (W.D. Ky. 1973), aff'd, 504 F.2d 1317 (6th Cir. 1974).
6 State environmental regulation of coastal development in the Florida Keys
had been in place well before 1973. See Pet. App. 80a-82a.
7 Work requiring a permit under both the RHA and CWA may be addressed in
a joint RHA/CWA permit application. Pet. App. 22a n.5 (citing 33 C.F.R.
Pt. 325 App. A).
8 The Corps issued a second, slightly modified permit in 1984. Pet App.
22a. In 1988, it granted petitioner a new RHA/CWA permit, with one significant
modification. Id. at 23a-24a. The new permit restricted the filling of each
wetlands-based lot to 40-by-40 foot building pads. Id. at 24a. That change
would have reduced the overall wetlands loss from 12.8 acres to 10.53 acres.
Ibid.
9 Petitioner did not seek state or local approval for that plan. The Court
of Federal Claims determined, however, that the plan would be subject to
Monroe County's prohibition on dredging to provide access for docking facilities
and on filling of salt marsh except where necessary to provide access to
a parcel. See Pet. App. 27a, 30a.
10 Section 7(a)(2) of the ESA requires federal agencies to "insure
that any action" they authorize "is not likely to jeopardize the
continued existence of any endangered species." 16 U.S.C. 1536(a)(2).
If an agency determines that a proposed action may adversely affect an endangered
species, it must engage in formal consultation with the FWS, which in turn
must provide the agency with a written "Biological Opinion." 16
U.S.C. 1536(a)(2); 16 U.S.C. 1536(b)(3)(A). If the FWS determines that the
proposed action will "jeopardize the continued existence" of the
species, 16 U.S.C. 1536(a)(2), the FWS must, if at all possible, suggest
"reasonable and prudent alternatives" that would allow the project
to go forward, 16 U.S.C. 1536(b)(3)(A). If an incidental "taking"
of individual members of a listed species is likely to occur as a result
of the proposed project, the Biological Opinion must include a statement
"specify[ing] the impact of such incidental taking" (commonly
known as an "incidental-take statement"). 16 U.S.C. 1536(b)(4).
So long as the permit applicant complies with the terms and conditions of
the statement, any incidental take is exempt from liability under the Act.
See 16 U.S.C. 1536(o); see generally Bennett v. Spear, 520 U.S. 154, 157-158
(1997).
11 In 1995, after petitioner's suit had been filed, the FWS initiated a
re-evaluation of its Biological Opinion and invited petitioner to assist
in revising the reasonable and prudent alternatives to determine the full
extent to which the site could be developed without jeopardizing the listed
species. Pet. App. 40a-41a. Petitioner reiterated his "refus[al] to
participate in any way in the alleged amended Biological Opinion."
C.A. App. 981. In May 1995, the FWS issued a new Biological Opinion with
revised reasonable and prudent alternatives. Pet. App. 41a. The revised
alternatives would have allowed construction of seven or eight waterfront
homesites in wetlands, complete with boat moorings and a navigable canal
connecting to the Sound, in addition to significant development of the uplands
portion of the site. Ibid.; C.A. App. 372-375, 385. The 1995 Biological
Opinion included an Incidental Take Statement, which would shield petitioner
from liability under the ESA for any incidental take of listed species,
if petitioner implemented the reasonable and prudent alternatives in compliance
with the statement's terms and conditions. Id. at 375-377.
12 In conducting that analysis, the government's appraiser assumed (contrary
to the CFC's subsequent determination, see note 9, supra) that state and
local approvals could be obtained for such a project. Pet. App. 70a.
13 Kaiser Aetna involved an unusual situation in which a developer dredged
a private fishpond in Hawaii and connected the fishpond to a nearby navigable
bay by opening a channel across a barrier beach that had separated the two.
444 U.S. at 166-167. The United States then relied on the navigational servitude
in asserting (1) that the pond had come under the Corps' authority under
the RHA, and (2) that the public should have a right of access to the pond.
Id. at 168-169. Although the Court held that mandating a right of public
access to the pond would constitute a taking in the circumstances presented,
id. at 177-180, it distinguished the scope of the navigational servitude
for purposes of federal regulatory authority, including that of the Corps
under the RHA, and it did not question the holding of the lower courts in
that case that the developer's connecting of the pond to the nearby bay
subjected the pond to the Corps' regulatory authority under the RHA. See
id. at 169 & n.3, 171 & n.6.
14 Petitioner's proposed development affected navigable waters in two respects.
First, the CFC found that petitioner's "1990 Corps application clearly
indicates that he proposed dredging below the [mean high water mark]."
Pet. App. 46a n.28. Second, petitioner's development proposal included the
dredging of a canal that would connect to Upper Sugarloaf Sound and thereby
provide the residents with waterfront access. Id. at 30a-31a.
15 See also Pet. App. 10a ("In legal terms, the owner who bought with
knowledge of the restraint could be said to have no reliance interest, or
to have assumed the risk of any economic loss. In economic terms, it could
be said that the market had already discounted for the risk, so that a purchaser
could not show a loss in his investment attributable to it."); Pro-Eco,
Inc. v. Board of Comm'rs, 57 F.3d 505, 511-512 (7th Cir.) (noting that a
landowner who "knew at the time it bought the land that the Board's
ordinance would hinder their efforts to develop the land however they wished"
presumably factored that potential difficulty into the purchase price for
the property), cert. denied, 516 U.S. 1028 (1995). In the instant case,
petitioner expressly acknowledged at the time of purchase that "as
of today there are certain problems in connection with the obtaining of
State and Federal permission for dredging and filling operations."
Pet. App. 2a.
16 Consideration of reasonable, investment-backed expectations in this context
is also supported by Ruckelshaus v. Monsanto Co., 467 U.S. 986 (1984). In
that case, the Court ruled that public disclosure of a company's proprietary
data could not constitute a taking, where the company "had no reasonable,
investment-backed expectation that its information would remain inviolate
in the hands of EPA." Id. at 1008. The Court found that factor alone
to be decisive, despite acknowledging that public disclosure of such data
could completely "destroy" the "economic value of [the] property
right" at issue. Id. at 1012; see also id. at 1005 (finding that "the
force of [the reasonable, investment-backed expectations] factor is so overwhelming
* * * that it disposes of the taking question"). The Court thus recognized
that the absence of interference with reasonable, investment-backed expectations
may itself be dispositive of a regulatory takings claim, regardless of the
extent of the challenged regulation's economic impact.
17 See also Lucas, 505 U.S. at 1034 (Kennedy, J., concurring in the judgment)
("The finding of no value must be considered under the Takings Clause
by reference to the owner's reasonable, investment-backed expectations.
* * * Where a taking is alleged from regulations which deprive the property
of all value, the test must be whether the deprivation is contrary to reasonable,
investment-backed expectations.").
18` Petitioner also relies (Pet. 13-14) on the district court's findings
in Tahoe-Sierra Preservation Council, Inc. v. Tahoe Regional Planning Agency,
34 F. Supp. 2d 1226 (D. Nev. 1999). But that decision has been appealed,
see Nos. 99-15641 & 99-15771, appeals pending (9th Cir.), and, in any
event, a conflict with a single district court opinion would not provide
a sufficient basis for invoking this Court's review.
19 See McQueen v. South Carolina Coastal Council, 496 S.E.2d 643 (Ct. App.
1998), cert. granted, No. 2779 (S.C. Mar. 18, 1999); Adams Outdoor Adver.
v. City of East Lansing, 591 N.W.2d 404 (Ct. App. 1998), review granted,
No. 113674 (Mich. Nov. 30, 1999); and City of Miami v. Keshbro, Inc., 717
So. 2d 601 (Dist. Ct. App. 1998), review granted, 729 So. 2d 392 (Fla. 1999).