APPENDIX C-31

TEST PROBLEM REPORT

The Test Problem Report form (see attached) is generated as required and is attached to the Test Analysis Report (Appendix C-29) during testing at the integration level and higher. The disposition of problems found, starting with integration testing, will be tracked and reported under configuration control.

Generate multiple copies of Test Problem Reports related to the deficiencies found in the test results, and track problem(s) until they are resolved. The Test Problem Report will vary according to the information system development project, its scope, and its complexity.

Test Problem Report Outline

TO: __________________

FROM: _________________

PREPARER/CONTACT: __________________ PHONE: ______________

PROGRAM BEING TESTED: _________________

 

DESCRIPTION OF TEST PROBLEM

A. Expected Results

 

B. Actual Results

 

DISPOSITION OF PROBLEM

Action Taken and Date Corrected

 

Risk Impact if Problem Not Corrected

 

Changes Required for Existing Documentation

 

SIGNATURES ____________________                                 _____________________
                                  Project Manager                                                System Developer

                         ______________________                               _____________________
                                          Date                                                                      Date